Apply for building control
Information you must provide to Wyre Council Building Control when you submit your building control application:
- number of dwellings that will be created (or bedspaces if the works are PBSA) by the works in the application or notice
- if permitted development rights are being used, confirmation of this and:
- confirmation that no prior approval of the Local Planning Authority (LPA) is required, and information illustrating this (for example, information identifying which permitted development rights are used under Schedule 2 of the General Permitted Development Order 2015), or
- confirmation that prior approval of the LPA is required and has been obtained and information identifying this, or
- confirmation that prior approval of the LPA is required and an application to the LPA has been made but not yet determined, or
- confirmation that prior approval of the LPA may be required and an application has not yet been made
- if the works are being developed under a planning permission, confirmation of this and:
- confirmation the planning permission has been granted, and the planning permission reference number, or
- confirmation that planning permission has been applied for, but it has not yet been granted, in which case the planning application should also be identified, or
- confirmation that planning permission has not yet been applied for
- if the dwellings and/ or purpose-built student accommodation that are being built are part of a nationally significant infrastructure project, a statement that the development is being constructed under a Development Consent Order
- a statement as to whether or not the works in the application or notice:
- are anticipated to be major residential development – that is, a development of 10 dwellings or more, or 30 or more bedspaces, if the works are PBSA, or
- form part of a wider development that is anticipated to be major residential development for which there is or is anticipated to be planning permission
- If an initial notice is given on behalf of a client, the signed statement from the client confirming that the levy information provided is accurate must be included
Further to this, you will also need to provide us with more detailed information when your first plot reaches commencement stage, for example when you get to slab level or, in the case of conversions, when 15% of the works have been completed.